Instance:
CMT2 1
- Number of Customers (n):
75
- Minimum Number of Vehicles (K):
10
- Capacity (Q):
140
- Tigh:
0.97
- Upper Bound (UB):
835.26 2
- Benchmark:
Christofides, Mingozzi and Toth (1979) [CMT]
- Demand:
[0,37]
- Distance:
EUC 2D
- Files:
1 The data of instance CMT2 is the same of E-n76-k10, but without rounding the cost matrix and specifying a value for K.
2 Optimal